Overclockaholics Forums

Overclockaholics Forums (http://www.overclockaholics.com/forums/index.php)
-   Water Cooling (http://www.overclockaholics.com/forums/forumdisplay.php?f=8)
-   -   [Project] Water Hybrid (http://www.overclockaholics.com/forums/showthread.php?t=4872)

MaadDaawg 11-14-2011 11:38 AM

Kiki,

If yu are using 1/2 fittings, you can use

7/16 ID 5/8 OD
7/16 ID 11/16 OD
1/2 ID X 5/8 OD
1/2 ID 3/4 OD

Tygon 3603 is very flexible and long lasting. Won't kink like vynle hose will. 7/16 gives you a real tight fitting on your fittings, but the 3/4 gives you greater preasure handling, which you really don't need. If you're going to use compression fittings, make sure they are for the size tubing you get

kikicoco1334 11-14-2011 11:53 AM

Thank you MD, I now have everything on it's way to me, so we should be good to go ;)

Now just waiting on Thanksgiving break

kikicoco1334 11-15-2011 02:52 PM

Just real quick......
6ft should be enough for my rig right?
I have a tiny system Antec Sonata

Same as this with out the PSU
http://www.newegg.com/Product/Produc...82E16811129024

MaadDaawg 11-16-2011 04:29 AM

Sounds about right, but difficult for me to know not really seeing it live. Thinking I used 10/12ft for my dual loop in a full tower though. This was with a dual loop, dual resv/pump in a dual bay slot so the distances were less than if I had used a pump mounted at the bottom of the case.

don't forget to take into account the exterior mounted rads - leave enough extra tubing to move them if you need to.

kikicoco1334 11-16-2011 07:33 AM

Yep I forgot taking count of the tubing between CPU and rad then to GPU.
I emailed the guy last night and doubled my original size of the order.
On the order said 2~3days and it's coming from Indianan, REALLY hopping it's gonna be like 1 day or so :rofl
But think again, it NEEDS to be 3 days, recently I found out i have absolutely no self control and I have two project due at the end of this week

I got my rig a part, and seems like the light strip is really a lot longer then I remembered so gonna change that up a little and also the old way i had the lights in it didn't really give the maximum lighting in the rig, cuz some of them had to over lap to fit.

My tablet is out of batt atm, but I'll post the new idea i got on the mounting for the rig is a little smarter and more removable

kikicoco1334 11-16-2011 07:49 AM

1 Attachment(s)
here y'all go!

pretty much install the mount first then install it on the case

MaadDaawg 11-16-2011 09:53 AM

WOW... that's a big rad man :D

Things you don't think will need changing always require some tweak or another.

If I order from him via UPS Ground on Monday, I get in on Tuesday cause I'm in Chicago. If I order 3 day shipping a Monday order will get here on weds/thurs - the bastards sit on it so you don't figure out the cheaper shipping :Dizzy:

kikicoco1334 11-16-2011 10:01 AM

The guy was telling me he is mailing it out today, let me get this test done i'll post what ever i am about to say in about 1hr or so

MaadDaawg 11-16-2011 10:06 AM

oh shit :shock:

we gotta wait a fucking hour to hear what you're gonna say :Dizzy:

:ohcrap:

:D

kikicoco1334 11-16-2011 12:48 PM

god damn it...
i just erased all the shit i typed....


well i was gonna say, my rad isn't that much bigger than yours dude, i have the std mcr-320 with 3 120mm fan on it, but more or less i am just glad i am about to be done with this rig so i can go back having fun.

oh and the new idea of my is gonna be better for the mounting as well, better air flow and all that good stuff

everything should be here this friday tho, but i prob ain't gonna beable to get to it till after 1630 cuz i don't get out of class till 1150, 1200 i have oil change (no idea how the hell am i gonna beable to make it up there....) then finally getting my fucking camera, i made an appointment with the general manager over there and he is gonna make sure i walk out with something.


All times are GMT -10. The time now is 02:44 PM.


Copyright ©2009 Overclockaholics.com