I already had the setup in place, filled and everything when I did the testing.
I simply did as described above to test run the system before actually applying power to the WC'ed system. That way if I had any leaks, there would be no risk of shorting anything out before I fixed the leaks I found.
Last edited by Bones; 10-31-2009 at 07:01 AM.
|