View Single Post
  #14  
Old 12-11-2009
V2-V3's Avatar
V2-V3 V2-V3 is offline
Asus Republic of Gamers
 
Join Date: Mar 2009
Location: IDAHO
Posts: 371
Rep Power: 17
V2-V3 is on a distinguished road
Default Pictures update and progress on -100c NexGen Cascade

Hello everyone,

I have just brazed in the hand expansion valve, and plate heat exchangers I replaced the liquid line filter dryer and added 1 suction line accumulator (small) and one liquid line accumulator (small)
I pulled a vacuum down to 50microns and held for 2 hours to ensure no leaks in the system.
The 1st stage has been pressure tested the system to 500PSIG for 1hr
I have charged some R-507 Refrigerant gas into the system and will let it sit at a static 150LBS over the night (or weekend) to further test the 1st stage for any leaks.

Once the 1st stage is fully operational I will start work on the second stage.

* pics are with my new camera, look any better?
Attached Images
File Type: jpg PICT0002.jpg (210.1 KB, 5 views)
File Type: jpg PICT0005.jpg (214.1 KB, 4 views)
File Type: jpg PICT0008.jpg (208.5 KB, 7 views)
File Type: jpg PICT0010.jpg (220.6 KB, 10 views)
__________________
"If it Doesn't Overclock its Broken!"
www.NexGenOverclocking.com

Last edited by V2-V3; 12-11-2009 at 07:20 PM.
Reply With Quote