I would probably look at a SS phase system instead.. way better bang for the buck..
2 cpu system is way different.. I would do the boreas to for a 24/7 setup... You can probably get a dual head phase change system though..
Chill, What temps do you plan on running the loops at? what about condensation on the top of those water blocks?
Coolitsystems.com is who makes the system.
__________________
|