Gauge prep! 6 lines made up, two lines for the hot gas bypass solenoid done as well.
JB Weld time, that will take the rest of the night to dry. Then will begin to pressure test components.
Oh also picked up 1/2" steel (smaller stuff) to weld up the cradle for the HX box.