Quote:
Originally Posted by karmakazi
Im not trying to derail your thread but how much wattage does the monstacade draw at load?
I bet electrical costs top $100/month to run it. I prefer to tweak on air cooling b4 I go ln2.
I think for the temp control ln2 is a better bet anyday over a cascade, just my opinion tho.
Here my breakdown:
$25 per dewar fill (lasts me ~3 weeks)
$200 - 50l taylor wharton
$300 - F1EE which can be updated to fit any socket for just a couple dollars for a new holddown/backplate
So I assume that for $1600 the mostercade/something similar could be had? I would need to fill my dewar ~50 times to equal the original cost. not including electrical usage each month to run that monster. 50 dewar fills = 150 weeks or almost 3 years of running ln2. in 3 years i bet the monstacade needs a regas and retune. that isnt free either...
Just my $.02
|
It aint cheap, but I'll say "Its EASY!" turn on switch, bench all u want, tune in clocks, turn off. Now run off to get some ln2 to see what else you can muster from it. In the end, it all costs more than an un-addicted person could stomach.